Site preparation, retaining wall construction, and mining civil facility works.

Developing mining infrastructure in challenging terrain was accomplished through deploying high-capacity heavy equipment fleets. We built heavy haul roads capable of supporting multi-ton dump trucks and engineered environmentally compliant mine runoff settling systems.

Scope of Work

1. Bulk land clearing, pad grading, and engineered bench slope terracing. 2. Construction of reinforced retaining wall structures and geotextile stabilization. 3. Mining haul road construction with heavy-duty compacted aggregate base course. 4. Construction of settling ponds and mine runoff sedimentation management systems.

Key Achievements

  • ✓
    Over 500,000 m³ earthmoving volume completed with zero environmental incidents
  • ✓
    All-weather stable haul road bearing capacity under heavy operational traffic
  • ✓
    Sediment pond settling system successfully controlled runoff turbidities effectively

Project Information

Client Name
Klien Pertambangan Nasional
Sector
Mining Infrastructure
Location
Sumatra
Completed
30 August 2024
Status
Completed