The industrial factory facility construction includes an integrated complex spanning production areas, raw material storage, and supporting utilities. Prioritizing engineering accuracy and meticulous mechanical installation, the facility was successfully handed over fully ready for operations.
Back to Portfolio
Factory Facilities
Status: Completed
Industrial Factory Facilities
Client: Klien Industri
Location: Sumatra & Java
Completed: Jun 2024
Documentation: Industrial Factory Facilities
Project Report & Overview
Construction of factory facilities, industrial tanks, and piping networks.
Scope of Work
1. Heavy structural steel erection for main manufacturing plant and workshop areas.
2. Precision heavy-duty concrete flooring with floor hardener finish.
3. Fabrication and erection of large-capacity industrial storage tanks.
4. Installation of industrial piping networks and comprehensive utility piping.
Key Achievements
-
✓100% pass rate on structural weld Non-Destructive Testing (NDT)
-
✓Flooring capacity engineered to support heavy machinery loads up to 20 tons/m²
-
✓Seamless HSE integration adhering to national industrial safety standards
Project Information
- Client Name
- Klien Industri
- Sector
- Factory Facilities
- Location
- Sumatra & Java
- Completed
- 30 June 2024
- Status
- Completed
Discuss Similar Project
Partner with our specialized engineering, procurement, and heavy construction teams on your next project.
Contact